Interior remodelling & space reconfiguration
Opening up layouts, removing walls, moving kitchens and bathrooms, splitting or combining rooms in villas, apartments and offices, with the structural engineer, the paperwork and the build under one contract.
Many Dubai villas were planned around a closed kitchen, a formal majlis and a maid’s room, and many apartments around rooms nobody now wants closed. Remodelling is how the plan catches up with how you live. But the difference between a wall that comes out in a morning and a wall that needs a beam, an engineer and a permit is invisible from the room, and a quotation that treats every wall the same is guessing about the one that matters.
We survey the structure and the drainage before we draw a plan. We tell you which walls are partitions, which carry load, where a kitchen can move and still drain, and what your community’s guidelines will and will not allow. Then we design the new layout with you, bring in the engineer where structure is touched, and make the joinery for the new plan in our own Al Quoz workshop while the paperwork runs, so the change arrives as one planned programme.
What remodelling covers
Each one carries a different structural weight. We say which at the site visit.

Removing the wall between kitchen and living, with extraction, gas arrangement and structure re-checked. See the Downtown kitchen.

Combining or re-dividing the ground floor so the formal majlis and the family living space both work.

Moving wet areas to a new position with falls to the stack, waterproofing and the electrical changes around them.

One large room into two, a study into a nursery, a majlis into a bedroom, with doors, lighting and AC re-zoned.

Maid’s rooms, under-stair voids and corridors turned into pantries, utility rooms and walk-in storage with joinery from Al Quoz.

Commercial layout changes, with the landlord consent and fire layout update they bring.
Structure & planning
Remodelling is the renovation scope most likely to touch structure or drainage, so the checks come before the design, not after it.
Book a site visitBlockwork and gypsum partitions can usually be removed without structural work. Load-bearing walls, columns, shear walls and slabs cannot be touched without a structural engineer’s drawings and calculations, and often a new beam. In towers, the columns and shear walls are fixed and cannot be cut. We tell you which is which before you fall in love with a plan.
A kitchen or bathroom can only move where it can still fall to a drainage stack without cutting structure. In a villa there is usually more freedom; in an apartment the stacks are fixed and the new position has to work with them. Gas kitchens in some buildings must stay enclosed. We trace the stacks at the site visit so the answer is yes or no before design starts.
Each master developer has design guidelines, and they differ. Facade and roof changes are commonly not allowed; some townhouse communities restrict changes to party walls; some towers restrict hard flooring above another unit. We read the guidelines for your community before we draw, and our area pages cover the communities we work in.
Once the plan is agreed, the engineer’s design is coordinated with ours and the BOQ is priced line by line. New joinery is made in our Al Quoz workshop, and on site our craftsmen handle demolition, gypsum, tiling and making good, with services re-routed under our contract.
Recent remodelling
Downtown, Sports City, Al Furjan, Dubai Hills and Abu Dhabi.







Scope & programme
We price line by line in a BOQ after a structural and drainage survey, and issue a dated programme that includes the approval route. These are the decisions that move both.
A non-structural wall is demolition and making good. A load-bearing wall is an engineer, a beam, temporary propping and a permit. The same opening on a drawing can be either, and the survey decides.
Relocating a kitchen or bathroom brings new drainage, waterproofing and electrical changes. It is the single biggest step up in both cost and programme in any remodelling scope.
Every removed wall carried something: sockets, switches, AC ducting, a drop for the ceiling light. Re-routing and re-terminating services is where remodelling budgets go that owners do not expect.
Opening a wall exposes two floors and two ceilings that were never meant to meet. Matching flooring and running a continuous ceiling across the join often costs more than the demolition itself.
A non-structural reconfiguration needs less paperwork. Structural change with engineer’s drawings sets the front of the programme, and we run joinery production in parallel so the time is used.
Remodelling is dusty, noisy and takes rooms out of use. Doing it in an occupied home means phasing and sealing, which is slower and costs more. The BOQ shows the difference so you can choose.
Tell us the community and what you want the plan to do. We will visit, identify which walls carry load and where the drains run, check what your community allows, and come back with a plan and a BOQ you can compare.
Common questions
Walls, wet areas, permits and what communities allow. If yours is not here, call +971 50 353 8845.
A non-structural partition, usually yes. A load-bearing wall, column or shear wall needs a structural engineer’s design and usually a new beam, and in most towers the structure cannot be altered at all. We identify which type the wall is at the site visit, before any plan is drawn.
Usually: the developer NOC (and in a tower the building’s), plus the permit from the authority that covers your area for structural change, new openings and relocated wet areas. We confirm the route at the site visit, prepare the drawings with the engineer and handle the submissions. More on our authority approvals page.
In most villas, yes. The wall is often non-structural, and the work is extraction, services and matching the floor and ceiling across the join. In apartments it depends on the building: some require a gas kitchen to stay enclosed. We check the structure, the gas supply and the building’s rules before saying yes. See the Downtown kitchen for an example.
If the new position can fall to a drainage stack without cutting structure, yes. Villas usually allow it; apartments depend on where the stacks run. It brings new waterproofing and electrical work with it and is the biggest single step up in cost and time in any remodelling. We trace the drainage at the site visit so you get a clear answer early.
It varies by developer. Facade, roof and external changes are commonly restricted in master-planned communities. Some townhouse communities restrict work on party walls, and some towers don’t allow hard flooring above another unit. We check the guidelines for your community before design, and our area pages cover Al Furjan, Dubai Hills Estate, Downtown and others.
Yes. Where a change touches structure we bring in a licensed structural engineer to design the beam or opening and produce the drawings and calculations needed, and we build to that design under one contract. You do not need to appoint one separately.
Only if it is planned. Two rooms that were never meant to join have different floor finishes, different ceiling heights and a strip of slab where the wall stood. We either match the existing floor where it can still be sourced or replace the whole area, and run a new continuous ceiling across the join. We price that in at the BOQ stage rather than leaving it until after demolition.
Remodelling is the part of renovation that changes the plan. A renovation can keep the layout and replace finishes; remodelling moves walls, rooms or wet areas. It is the scope most likely to need an engineer, which is why it has its own page. For a full-property scope see villa renovation or apartment renovation.
Yes. We work across the UAE, including Abu Dhabi and Sharjah, and confirm the structural and approval requirements for each at the site visit. See our Abu Dhabi page.