Healthcare & dental clinic fit out
Dental and medical clinic fit out across Dubai: treatment rooms, sterilisation zoning, chair services, X-ray shielding coordination, infection-control finishes and reception joinery from our own Al Quoz workshop, built to the health authority’s reviewed layout under one contract.
Healthcare is the one commercial sector in Dubai where the layout is approved before the fit out and the finished room is inspected against it. The health authority reviews the clinic plan as part of the facility licence (room sizes, the separation of clean and dirty flows, hand-wash provision, surface finishes) and then sends an inspector to check that what was built matches. A contractor who moves a partition to suit a duct, or swaps a floor finish to save money, has just created a reason for the licence to be refused.
We build clinics to the approved drawing and coordinate everything else around it. Chair suction, drainage, compressed air and power are routed to each surgery before partitions are framed; X-ray room shielding is coordinated with the radiation protection adviser and the equipment supplier before the walls go up; finishes are specified for cleanability from the schedule the inspector works from. Aussie Smile in Jumeirah, the dental clinic at Al Warba Centre and the wellness centre in JLT were all delivered this way, design and build complete.
What a clinic fit out covers
Dental practices, GP and specialist clinics, aesthetic and wellness centres, physiotherapy and day-care units. Each has its own room schedule; the process is the same.

Suction, drainage, compressed air and power routed to each chair position before framing, coordinated with the chair supplier’s template.

Dirty, clean and sterile flows kept separate, hand-wash where staff need it, and surfaces the inspector can wipe a glove across.

Reception desks from our workshop with privacy screening and records storage, waiting areas sized to the room count.

Room sizes and shielding coordinated with the radiation protection adviser and the equipment supplier before a partition is built.

Seamless floors with coved skirtings, washable wall systems, sealed ceilings and joinery finishes that survive clinical cleaning.

Treatment rooms that feel like an interior rather than a hospital, built to the same clinical requirements underneath.
How we work
The health authority’s layout review sits at the front and its inspection at the end. Everything we design and build is sequenced between those two, under one contract.
How we handle approvalsWe start with the specialty, the number of surgeries or treatment rooms and the equipment schedule, then visit the unit. The first thing we check is what the base build can give a clinic: drainage to every surgery, extract from sterilisation and the lab, and electrical capacity for chairs, imaging and sterilisers. Clinics in residential or mixed-use towers have the strictest noise and working-hour rules, so we read those too.
The licence applicant (the clinic owner, usually through a healthcare licensing consultant) submits the layout to the health authority for design review against its facility guidelines: room schedule and sizes, clean and dirty separation, hand-wash provision, finishes. We prepare the layout drawings to that standard and coordinate with your consultant. The reviewed drawing becomes the document we build to and the inspector checks against.
The building’s fit out permit and the permit from the authority that covers your unit are handled as part of our scope. We confirm the route at the site visit and prepare the drawings. The detail is on the approvals page.
Chair suction, drainage, compressed air and power are routed to each surgery against the chair supplier’s template before partitions are framed. MEP and fire work are delivered under our contract by the group’s MEP specialists, and the related submissions are coordinated as part of the project. Imaging rooms are sized and shielded with the radiation protection adviser before the walls go up.
Reception desks, surgery cabinetry and storage are made in our own joinery workshop in Al Quoz while the site works run, with wipe-clean finishes and no open joints. On site, seamless floors with coved skirtings, washable wall systems and sealed ceilings go into the clinical rooms. Chairs, X-ray units and medical gas are then installed by their suppliers on live services.
The finished clinic is inspected against the reviewed layout and the infection-control requirements before the facility licence is issued. We attend, hand over as-built drawings and finish schedules, and close any snag the inspector raises.
Recent healthcare and commercial work
Jumeirah, Al Warba Centre, JLT, Al Quoz, JVC and Sharjah.







Scope & programme
We price line by line in a BOQ after surveying the unit and reading the equipment schedule, and issue a dated programme written around the layout review, the inspection and your licence date. These are the decisions that move both.
Each dental chair or treatment room carries its own drainage, suction, air and power, plus the partitions and finishes around it. The room count sets the services scope more than the floor area does.
An intra-oral X-ray in a surgery, a panoramic unit in its own room and a CBCT scanner are three different shielding and room-size problems. Each is coordinated with the radiation protection adviser before the walls are built.
Seamless flooring with coved skirtings, washable wall systems and sealed ceilings cost more than an office specification and are what the inspector looks at. Specifying them from the authority’s requirements avoids replacing them after the visit.
A unit with drainage available where the surgeries will be is a different scope from one where every chair needs a route back to a stack. This is confirmed at survey against the approved layout.
Joinery, lighting and waiting-area finishes are where a clinic stops looking clinical. Made in our own workshop, they are the part of the budget the practice controls most freely.
The health authority’s layout approval, the equipment delivery dates for chairs and imaging, and the final inspection slot. We build joinery in the workshop during the approvals and sequence the installers around the chair deliveries.
Tell us the specialty, the number of surgeries or treatment rooms, the unit and the date you need the licence. We will visit, prepare the layout for the authority’s review, and come back with a dated programme and a BOQ priced line by line.
Common questions
Layout approval, inspection, chair services, imaging and finishes. If yours is not here, call +971 50 353 8845.
The health authority’s review of the layout as part of the facility licence application, the landlord’s fit out permit, and the permit from the authority that covers your unit. The finished clinic is then inspected by the health authority before the facility licence is issued. Landlord and fit out approvals are handled as part of our scope: we confirm the route at the site visit, prepare the drawings and build to the reviewed layout.
The facility licence is applied for by the clinic owner, usually through a healthcare licensing consultant, and the layout approval sits inside that application. We prepare the layout drawings to the authority’s facility guidelines, coordinate with your consultant, and build and hand over to the reviewed drawing so the finished clinic matches it.
That the built rooms match the approved layout; that clean, dirty and sterile flows are separated and the sterilisation room is laid out correctly; hand-wash basins where required; floor, wall and ceiling finishes that are seamless and washable; suction, drainage and air at each chair; shielding and signage on the X-ray room; and storage for records, consumables and waste. We build from that list, not towards it.
Yes, if the unit is zoned for it and the building can provide the drainage, extract and power a clinic needs. Towers have the strictest noise and working-hour rules, and drainage to every surgery is the first thing we check at survey. Aussie Smile in Jumeirah and the clinic at Al Warba Centre were both fitted out inside existing buildings.
The equipment is installed by its supplier. Under our contract, the suction, drainage, compressed air and power are routed and tested to each chair position against the supplier’s template before partitions are framed, the X-ray room is built to the size and shielding the radiation protection adviser specifies, and we sequence the installers so every unit lands on live services.
Seamless, washable and sealed. Vinyl or resin floors with coved skirtings, washable wall systems or hygienic paint, sealed ceilings in clinical rooms, and joinery with wipe-clean finishes and no open joints. Reception and waiting can be as warm as any interior; the treatment rooms are specified from the authority’s requirements. See flooring for the systems.
Yes, and it is most of what we are asked for. Aussie Smile was briefed as a deliberate move away from the conventional clinical interior; the wellness centre in JLT was briefed as “a gateway to wellness”. Both meet the clinical requirements underneath. Reception joinery, lighting, curved forms and a restrained palette do the work, and they are made and finished in our own workshop.
It is set by the health authority’s layout review at the front, the equipment delivery dates for chairs and imaging in the middle, and the inspection slot at the end, more than by the floor area. We issue a dated programme before mobilising and build joinery in the workshop during the approvals.
Yes. The process is the same with the local health regulator substituted: the Department of Health in Abu Dhabi and the Ministry of Health and Prevention in Sharjah, alongside the local fit out approvals. See the Abu Dhabi page for work in the capital.