MEP works: mechanical, electrical & plumbing
HVAC, electrical, plumbing and fire and life safety for commercial and residential fit out: designed from the layout, installed in sequence with the partitions and ceilings, commissioned and handed over with as-built drawings, under the same contract as the rest of the job.
A meeting room that never cools. A kitchen whose extract was never approved. A sprinkler head left under a new bulkhead, and an inspection that cannot be closed. Power sockets that miss the desks because the electrician worked from an old furniture plan. In Dubai the fit out contractor and the MEP contractor are often two companies, and the gap between them is where these problems live, with each working to its own drawing, each able to point at the other when the inspector arrives.
We close that gap by keeping MEP inside the fit out contract. The work is delivered under our contract by the group’s MEP specialists: they survey the base build, draw the services on one coordinated set against the partition and ceiling plan, and carry out the mechanical, electrical, plumbing and fire work on site through first fix, second fix and commissioning, with the DEWA and Civil Defence submissions coordinated as part of the project. Our project manager runs it on the same programme as the partitions, ceilings and joinery. One contract, one programme, one party responsible. You can see it on the Polygon Agglayer office, where curved walls and lit coves had to be coordinated with the services above them, and in our clinic and restaurant work.
What MEP works cover
Delivered as part of an office, retail, F&B, clinic or residential fit out. We do not take on standalone MEP contracts for shell buildings; we deliver the services the interior needs.

Ducting, diffusers and FCU relocation to suit the new plan, fresh air and extract, and rebalancing so every room actually cools.

Boards, sub-mains, small power set out from the furniture plan, lighting and controls, and emergency lighting to the fire safety requirements.

Hot and cold water, drainage with falls, pantries, bathrooms, kitchens and clinical rooms, with wet-area relocations approved.

Sprinkler heads and detectors relocated to the new ceiling plan under our contract, with the submission and inspection coordinated.

Commercial kitchen hoods and ducts, sterilisation and lab extract, gym fresh-air loads, each sized for what the room actually does.

Pressure tests, electrical certification, air balancing reports and as-built drawings for the landlord’s file and yours.
Process
Six steps, and the first two are the ones most contractors skip. Services drawn from the actual base build and coordinated on one set do not clash on site.
Ask about your buildingExisting FCUs and their capacity, distribution boards and spare ways, risers, drainage points, sprinkler mains and the landlord’s schedule of what the unit was handed over with. Base-build drawings are often wrong; we survey above the ceiling before designing anything, because the difference between a spare way on the board and a new supply changes the whole programme.
Ducting, power, lighting, drainage, sprinklers and data drawn together against the partition and ceiling plan and the furniture layout, so a duct does not land where a downstand is and a socket is where the desk will be. This set is what goes for approval and what the site team builds from.
New boards, increased demand and changes to sprinkler heads, detection, emergency lighting or escape routes all need approval and an inspection. These submissions are coordinated as part of the project and go in with the main fit out package, because an MEP approval left until the end holds up the whole handover.
Containment, ducting, pipework, drainage and sprinkler alteration are installed while partitions are open and before ceilings are fitted. Every route is checked against the coordinated set before it is closed in, because this is the last point at which a clash is cheap.
Fittings, devices, diffusers, boards and controls installed; then pressure tests on pipework, electrical testing and certification, air balancing room by room, and fire-system testing witnessed by the landlord where required.
The authorities inspect, the landlord witnesses, and the tenant receives as-built drawings, test certificates and the balancing report. The landlord keeps the file for the life of the lease and will ask for it when the next tenant moves in.
Recent work
Offices, clinics, restaurants and gyms, where MEP is the largest line.






Scope & programme
MEP is priced line by line inside the fit out BOQ after the base-build survey, so you can see what the building gives you and what has to be added. These are the decisions that move it.
A Cat A floor with FCUs, sprinklers, a board with spare ways and drainage at the core is one starting point. A raw shell with capped services is another. The survey settles this before anything is priced.
A new pantry, bathroom, kitchen or surgery away from the existing drainage means new drainage with falls, often through a slab or back to a riser, plus the related approval. It is the single biggest step up in services scope.
Meeting rooms, server rooms, kitchens and gyms carry heat loads an open office does not. Where the landlord’s FCUs cannot meet them, the alternative is additional units and condensate routes, which is a design decision, not a site one.
Kitchens, dental chairs, imaging and server loads can exceed the unit’s allocation. A load increase and a new board are programme items as much as cost items, so they are raised at the start.
Every partition and ceiling change moves heads and detectors. The work is modest; the drawing approval and inspection are not, which is why they go in with the main package.
Services approvals, long-lead equipment such as FCUs and boards, and first fix finishing before ceilings close. We sequence the trades so the ceiling is never waiting on a service that could have been installed earlier.
Tell us the building, the unit and what the space will be used for. We will survey above the ceiling, compare it with the landlord’s schedule, and come back with a coordinated services design priced inside the fit out BOQ.
Common questions
Scope, approvals, coordination and what you receive at handover. If yours is not here, call +971 50 353 8845.
Mechanical, electrical and plumbing: the air conditioning and ventilation, the electrical distribution, lighting and power, the water supply and drainage, and, grouped with them, the fire detection and sprinkler alterations and the containment for data and AV. In a fit out it is everything above the ceiling and behind the walls that the finishes depend on, and in services-heavy sectors such as F&B, healthcare and fitness it is the largest line in the budget.
MEP is designed, coordinated and delivered under our fit out contract by the group’s MEP specialists, who produce the coordinated drawings and carry out the mechanical, electrical, plumbing and fire work through first fix, second fix and commissioning. The DEWA and Civil Defence submissions are coordinated as part of the project, and our project manager runs the whole job. You have one contract and one party responsible, rather than a fit out contractor and an MEP contractor each working to their own drawing.
Not for shell buildings or standalone plant. We deliver MEP as part of an interior fit out (office, retail, F&B, clinic, gym or residential) because the value is in the coordination with the partitions, ceilings and joinery. If your project is an interior, the services are in our scope; if it is a building services contract, it is not what we do.
New distribution boards, increased electrical demand and relocated wet areas need the electricity authority’s approval and an inspection before power is released, and any change to sprinkler heads, detection, emergency lighting or escape routes needs fire safety approval and an inspection before handover. The landlord and the authority that covers the unit approve the fit out drawings the services sit within, and sector bodies add their own for kitchens and clinical rooms. All of it is coordinated as part of the project. See authority approvals.
Because the drawings are often out of date. Previous tenants alter services, FCUs are swapped, spare ways on the board get used. A survey above the ceiling before design means the drawings describe what is actually there, and it is the difference between finding a spare way on the board and discovering mid-programme that a new supply is needed.
Usually. The cause is most often partitions built without the air being rebalanced, diffusers in the wrong rooms, or an FCU serving a load it was never sized for. We survey, measure, and either rebalance, re-duct or add capacity, and the same applies to rooms that are too cold.
We install the containment and first fix for data, AV, CCTV and access control and coordinate with the specialist installers who terminate and commission them, so the routes exist before ceilings close and the devices are where the furniture plan says they should be. Telecom provisioning from the provider runs on its own lead time, and we raise it at the start.
As-built drawings for every service, electrical test certificates, pressure-test records, the air-balancing report, fire-system test records witnessed by the landlord where required, and the inspection approvals. The landlord keeps the file for the life of the lease, and it is what the next fit out will be surveyed against.