Apartment fit-out in Dubai, building approvals included.

Handover and shell-and-core apartments in Downtown, Dubai Marina, Business Bay, JVC, JLT and La Mer — for owners moving in and investors letting out. Developer and building NOCs, lift bookings and working hours handled; kitchen and wardrobes made in our own Al Quoz workshop.

In a tower, the fit-out is governed by the building, not just the drawings.

A new apartment arrives at handover with the developer’s standard finishes, or as a shell-and-core unit with none at all. Either way the kitchen, wardrobes, lighting and bathrooms have to be made yours, and in a tower every one of those decisions passes through the building: the owners association or facilities manager issues its own NOC, sets working hours, allocates the service lift, limits noise, asks for insurance and a method statement, and usually holds a deposit against the corridor and the lift car. Most fit-out firms quote the works and leave that to you.

We fit out apartments as one scope with the building logistics inside it. Our design team draws the unit, we hold registration with the six major developers and submit to both the developer and the building, our MEP team works within the riser and ceiling-void constraints a tower sets, and our own workshop makes the kitchen, wardrobes and vanities in modules sized for the service lift. The Residence at Downtown and the Apartment at La Mer were both delivered this way. If your apartment is already lived in, the apartment renovation page is the right one; for the design process alone, see apartment interior design.

6Developer registrations — Emaar, Nakheel, Meraas, Dubai Holding, Nshama, DAMAC
40+In-house craftsmen making kitchens and wardrobes in modules sized for the lift
2NOCs on every tower job — developer and building management
ISO45001:2018 certified for occupational health & safety

What an apartment fit-out covers

Handover unit, shell and core, or an investor let.

Three starting points, one process. The specification changes; the approvals and the sequence do not.

Process & approvals

What your building will ask for, in order.

Every tower runs its own version of this. We have done it enough times to know what each one wants before they ask.

Ask about your building
01

Handover and as-built survey

We review the developer snagging so defects stay with the developer, then measure the unit as built. In a tower the survey also records the ceiling void, the AC routes, the riser positions and the drainage falls, because those three things decide where a kitchen or bathroom can realistically go.

02

Design and shop drawings, sized for the lift

Layouts, 3D visualisation and a material schedule, then joinery shop drawings with every carcass sized to pass the service lift and the corridor turn. It sounds obvious; it is the most common reason apartment joinery arrives in pieces.

03

Developer NOC and building NOC

The master developer issues its NOC first. The owners association or facilities manager then issues the building NOC against a method statement, contractor insurance, approved working hours, lift bookings, noise limits and a refundable deposit for the common areas. Moving wet areas or touching the slab adds a Dubai Municipality or Trakhees permit. We prepare and chase all of it.

04

MEP first fix while joinery is made

New circuits, relocated points, AC rebalancing and kitchen and bathroom plumbing go in within the building’s hours while our Al Quoz workshop makes the kitchen, wardrobes and vanities. Deliveries are booked into lift slots so nothing waits in the lobby.

05

Finishes, installation and handover

Flooring, ceilings and paint, then joinery installed and templated against the finished room, then furniture and curtains if they are in scope. The unit is snagged, cleaned, the deposit recovered from the building, and the keys handed back once.

Recent apartments

Apartment fit-outs across Dubai and Abu Dhabi

Downtown, La Mer, Meydan and Abu Dhabi.

Residence at Downtown — apartment fit-out in Downtown, Dubai
Residence at DowntownPrivate residence · Downtown, Dubai
Apartment at La Mer — apartment fit-out in La Mer, Dubai
Apartment at La MerApartment interior · La Mer, Dubai
Apartment at Lamar — apartment fit-out in Abu Dhabi
Apartment at LamarApartment interior · Abu Dhabi
Kitchen Renovation, Downtown — apartment kitchen in Downtown, Dubai
Kitchen Renovation, DowntownKitchen renovation · Downtown, Dubai
Senses, The Fields — residence fit-out in Meydan, Dubai
Senses, The FieldsPrivate residence · Meydan, Dubai
The Dahlia — residence fit-out in Abu Dhabi
The DahliaPrivate residence · Abu Dhabi
Townhouse at Emaar Valley — townhouse fit-out in The Valley, Dubai
Townhouse at Emaar ValleyTownhouse interior · The Valley, Dubai

Scope & programme

What drives an apartment fit-out budget.

We price line by line in a BOQ after the survey rather than quoting a rate per square foot, and issue a dated programme that respects the building’s working hours. These are the decisions that move both.

Handover-finished or shell and core

A handover unit keeps its floors, ceilings and bathrooms unless you choose otherwise. Shell and core needs screeds, partitions, ceilings and full MEP before any finish, and is programmed as the larger scope from the start.

Owner-occupier or investor

A home you will live in carries a fuller joinery and lighting package. A unit going to the rental market is specified for durability and turnover, with hardware and finishes that survive tenants and photograph well.

Kitchen and bathrooms on the riser

Keeping wet areas on the existing riser is the quickest route and the one buildings approve readily. Moving them means new drainage falls in a shallow void, a fuller permit and often a refusal, and we say so at design stage.

Building hours and lift access

Most towers restrict noisy work to set hours and allocate the service lift by booking. A tower with a single service lift and short hours simply takes longer than a low-rise, and the programme is drawn around it rather than hoping.

The joinery package

Kitchen, wardrobes and a TV wall are usually the largest line after the bathrooms. Making them in our own workshop in lift-sized modules controls cost and avoids the on-site assembly that damages corridors.

Imported materials

Imported stone, tiles, sanitaryware and appliances are the long-lead items. We confirm availability before the programme is fixed so a slab or an appliance does not hold a finished room.

Tell us the tower.

Building name, handover date and whether you are moving in or letting out. We will survey, tell you what that building asks for, and come back with a BOQ and a programme drawn around its working hours.

Common questions

Apartment fit-out in Dubai, answered.

Building NOCs, shell and core, investor units and lift logistics. If yours is not here, call +971 50 448 3095.

What approvals does an apartment fit-out need in Dubai?

Usually two, sometimes three. The master developer issues an NOC for the unit; the owners association or building management issues a building NOC with working hours, lift bookings, insurance and deposit conditions; and if the scope touches the slab, the facade or moves wet areas, Dubai Municipality or Trakhees issues a permit on top. We prepare and chase all of them as part of the contract.

Can you fit out a shell-and-core apartment?

Yes. A shell-and-core unit has structure, envelope and service connections only, so the fit-out builds partitions, screeds, ceilings, full MEP, wet areas, joinery and finishes. It is a larger scope than a handover-finished unit and we programme it as one from the first day, with the building’s hours and lift access drawn into the schedule.

Do you fit out apartments for investors who will rent them out?

Yes, and the specification is different on purpose: durable flooring and hardware, finishes that survive tenancy turnover, a kitchen and wardrobes that photograph well for listings, and everything delivered before the first viewing. Landlord consent is not an issue when you are the owner, but the building NOC still applies.

Can I move the kitchen or a bathroom in an apartment?

Sometimes, but it is the single biggest step up in cost, programme and approval risk. Drainage has to reach the existing riser with adequate fall inside a shallow ceiling void, the building and the authority both have to approve it, and many towers refuse. We check the riser and void at survey and tell you whether it is realistic before you design around it.

How do you get a kitchen into a tower?

In modules. Every carcass, wardrobe and panel is drawn to pass the service lift and the corridor turn, made that size in our Al Quoz workshop, delivered into booked lift slots and assembled in the unit. It avoids the on-site cutting that damages corridors and loses deposits.

Which areas do you work in?

Across Dubai’s tower districts: Downtown, Dubai Marina, JLT, Business Bay, JVC, La Mer and the Palm, plus Abu Dhabi and Sharjah. Recent apartments include the Residence at Downtown, the Apartment at La Mer and the Apartment at Lamar in Abu Dhabi. The Downtown, JVC and La Mer pages cover what each building type asks for.

What is the difference between apartment fit-out and apartment interior design?

Interior design is the drawings, 3D and material selection; fit-out is building it, with the approvals and site logistics. We do both under one contract, but if you only want the design package, apartment interior design explains what you receive. A lived-in apartment being reworked is an apartment renovation and has its own page.

Will the building hold a deposit, and who recovers it?

Most buildings hold a refundable deposit against damage to corridors, lifts and lobbies for the duration of the works. We protect those areas, keep the deliveries in booked slots, arrange the building’s final inspection and recover the deposit at handover as part of closing the job.