La Mer & the beachfront
A contemporary apartment delivered at La Mer: open-plan living replanned for flow, with custom joinery and integrated lighting throughout. A Meraas beachfront community, where salt air decides the specification as much as taste does.
La Mer is a Meraas community a few metres from the water, and that changes what should be specified. Salt air and humidity are hard on ironmongery, metal finishes, veneers and anything with an unsealed edge. A hinge or handle chosen for an inland apartment will not wear the same way here, and the problem shows up after the family has moved in rather than at handover.
So we specify for the location: hardware and finishes selected for coastal exposure, edges properly sealed, and joinery made in our Al Quoz workshop and delivered finished rather than assembled in a humid corridor. The rest is the usual tower discipline: the building’s contractor requirements, service lift booking and permitted working hours, with deliveries planned to limit disruption. The same thinking applies to the beachfront villas and residences nearby on Jumeirah Bay Island and Pearl Jumeira.
Our beachfront work
An apartment at La Mer, alongside tower and residential work across Dubai.







Approvals
The building comes first, then the Meraas NOC, then a permit where the work needs one. We confirm your building’s rules and the full route at the site visit.
Ask about your buildingThe contractor’s trade licence, method statements and health and safety file, plus a refundable deposit. Buildings here restrict working hours, allocate service lift slots and specify corridor protection and the waste route, and some keep their own contractor list. We prepare the application ourselves rather than handing it back.
La Mer is a Meraas master community, so works need the developer’s no-objection certificate alongside the building’s own approval. We are registered with Meraas.
Structural, facade and significant MEP changes need a permit from the authority that covers the community. Finishes, loose furniture and like-for-like joinery usually need only the building and Meraas approvals. We confirm the route for your unit at the site visit and prepare the drawings. More on our approvals page.
Changes to partitions, ceilings, sprinklers, detection, emergency lighting or escape routes need Civil Defence approval with an inspection before handover. Load increases and relocated wet areas need DEWA sign-off. Both are coordinated as part of the project.
What we do here
La Mer work is residential, and the coastal setting shapes the specification more than people expect.

Open-plan living, dining and kitchen replanned for flow, with custom joinery and integrated lighting throughout.

Custom cabinetry with soft-close hinges, appliance housings built to the specific models and templated worktops.

Made in our Al Quoz workshop and delivered finished, which matters when the service lift is booked in slots.

Waterproofing, falls, stone finishes and vanity joinery, within what a building’s fixed drainage risers allow.

Hardware, metal finishes and veneers selected for salt air and humidity, with edges sealed properly.

Design, approvals, joinery, MEP coordination and site delivery under a single contract and one project manager.
Scope & programme
We price line by line in a BOQ after a site visit and issue a programme before work starts. These are the decisions that move both.
Hardware, metal finishes and veneers have to be chosen for salt air. Specifying inland products here is cheaper at the start and costs more once they need replacing.
Booked lift slots, one loading bay and a permitted working window set the pace. The same scope takes longer in a strict building than a lenient one.
Moving a kitchen or bathroom is the biggest single step up, because drainage runs to fixed risers and the move is constrained before it is costed.
Kitchen, bathrooms and joinery usually take the largest share. Access restrictions add labour rather than material cost.
Units made in our workshop and delivered finished keep lift time, dust and noise down, and avoid assembling veneered joinery in humid air.
Relocating wet areas, structural change, long-lead imported stone and out-of-hours working where the building requires it. All flagged at quotation stage.
Give us the building and the scope. We will check its contractor and access rules, visit and measure, confirm what the coastal setting means for the specification, and come back with a BOQ you can compare properly.
Common questions
Approvals, coastal specification and tower logistics. If yours is not here, call +971 50 353 8845.
Yes, and the building comes first. A fit out application needs your contractor’s trade licence, method statements and health and safety file, plus a refundable deposit, and some buildings keep their own contractor list. La Mer is also a Meraas master community, so works need the Meraas NOC alongside. If you are renting, you need the owner’s written consent first.
It depends on the scope. Most jobs need the building’s fit out approval and the Meraas NOC. Structural, facade and significant MEP work also needs a permit from the authority that covers the community. Finishes, loose furniture and like-for-like joinery usually need only the building and Meraas approvals. We confirm the exact route for your unit at the site visit and prepare the drawings.
Yes, more than most people expect. Salt air and humidity are hard on ironmongery, metal finishes, veneers and unsealed edges, and a hinge or handle specified for an inland apartment will not wear the same way here. We select hardware and finishes for coastal exposure and seal edges properly. The difference shows up in use, not at handover.
Scope drives it far more than area. A refresh with no layout change sits at one end; a reconfigured layout with new wet areas and bespoke joinery at the other. Kitchen, bathrooms and joinery usually take the largest share, and access restrictions add labour rather than material cost. We survey the unit and price line by line in a BOQ.
Within limits. Drainage runs to fixed risers, so a wet area can rarely move far without a drop the floor build-up has to absorb. Non-structural partitions can usually change with the building NOC and a permit where one applies; structural walls need a structural engineer’s drawings and a permit. We check what is possible before you commit to a layout.
They vary by building and we confirm yours at the site visit. The common pattern is weekday working with limits on noisy work, a service lift booked in slots, a single loading bay, corridor and lift protection and a defined waste route. We plan deliveries into fewer, larger loads to work within that.
Yes, in our own Al Quoz workshop, by our team of 40+ in-house craftsmen. Units arrive finished and go up in a booked lift rather than being built in a corridor, which keeps dust, noise and lift time down and avoids assembling veneered joinery in humid coastal air. See our joinery page.