Commercial interior design
Offices, clinics, gyms and workspaces designed by a studio that also builds them, so the drawings you receive work for the building, for the business and for the contractor who has to price and build them.
You, the landlord and the people who build it. A design that pleases only the first is the reason so many Dubai fit-outs are redrawn after the lease has started: the ceiling void cannot take the new ducting, the building’s fit-out guide prohibits the glazing detail, or the reception desk cannot be made the way it was drawn. The render was lovely. The office opened late.
We design commercial interiors from the constraints outward. The base-build services, the fit-out guide and the fire strategy are established at the site visit, and the concept is drawn to live inside them. Approvals are handled as part of the job, and because we build what we draw, the joinery and the finishes are specified by people who will make them in our own Al Quoz workshop. See the Polygon Agglayer office, the JLT wellness centre and the Al Warba dental clinic.
What we design
Each space type has its own flows, services and finishes. The pages linked below cover the ones with their own detail.

Open-plan, cellular and hybrid layouts with meeting ratios, acoustics and the ceiling and MEP coordination behind them.

Treatment rooms, sterilisation flow, medical gas and drainage planned into the layout from the start.

Equipment layouts, studio acoustics, changing rooms and wet areas with the structural and MEP loads they bring.

Test fits for headcount and growth on a real floor plate, before the lease is signed.

Reception desks, brand walls and storage walls detailed by the designer and made in our own workshop.

Boardroom-ready views of the proposal for internal sign-off, from the same model we detail from.

Landlord and authority drawings prepared from the same design model, with approvals handled.

Cat A to Cat B office fit-out by the same team, under one contract, or drawings issued to your contractor.
How we work
Four stages, one model, and a design team that sits next to the people who will build it.
How we handle approvalsAlmost every commercial building in Dubai issues a fit-out guide, and it governs more than people expect: where you may connect to base-build chilled water, whether partitions can touch the facade, what the ceiling void will take, which glazing and door details are permitted on the corridor line. We visit the floor and read it before the first layout is drawn.
Your headcount, meeting ratios, flows and growth plan are laid on the real floor plate, then the concept, finishes and 3D views are developed for sign-off. The fire strategy and services are drawn into the concept rather than retrofitted, because a late services or fire layout is one of the most common reasons a commercial interior is redrawn.
Working drawings, ceiling and lighting plans, FF&E and finishes schedules, and joinery details drawn for our Al Quoz workshop to make. If we are also building it, the BOQ is priced line by line from the same drawings, so the design and the budget are checked against each other before anything is ordered.
The landlord drawings and the set for the authority that covers your building are prepared from the same model, and approvals are handled as part of the job. We have worked in or can work in the DDA, DMCC, DIFC, JAFZA and DSO areas as well as the mainland. Clinics and restaurants add a sector approval, which we plan for at the brief stage. Then our team builds it, or we issue the set to your contractor.
Commercial projects
Al Quoz, Silicon Oasis, JLT, Jumeirah, JVC and Sharjah.






Scope & fees
Quoted per stage after we have seen the floor plate and the fit-out guide. These are the decisions that move it.
A shell-and-core floor needs ceilings, raised floors and base MEP designed in. A Cat A floor with those in place is a Cat B design on top: partitions, finishes, joinery and IT. The second is far less drawing.
Every enclosed room adds a door, a ceiling edge, an AC branch, lighting and often a fire detection or sprinkler change. A floor of meeting rooms and offices carries more detail than the same area open-plan.
Clinics, labs and commercial kitchens bring medical gas, drainage, extraction and specialist power that have to be coordinated room by room. A standard office does not.
A reception desk, brand wall and storage wall drawn for our workshop take real detailing hours. Loose furniture from a catalogue takes a schedule.
The landlord and the authority each need their own set, and a clinic or restaurant adds a sector approval. Each is prepared from the same model but checked and formatted separately.
When we also build, the design carries straight into the BOQ and the workshop, with no re-drawing by a second firm. Design-only clients receive the same package and we answer the contractor’s questions through the build.
The building, the floor plate and the headcount or room schedule are enough to start. We will tell you what the fit-out guide will and will not allow, confirm the approval route, and quote the design stages.
Common questions
Approvals, deliverables, Cat A and Cat B, and working with your landlord. If yours is not here, call +971 50 353 8845.
A home answers to its owner and the developer. A commercial interior also answers to the landlord’s fit-out guide, the authority that covers the building and, for clinics and restaurants, a sector regulator. That changes how the ceiling, the partitions, the escape routes and the services are planned from the first sketch. It also has to work for a business: headcount, flow, acoustics, brand and durability of finishes under heavy use.
Yes. A free-zone office is approved by the zone’s own authority, with its own drawing format, and we prepare the set for the one that covers your building. We have delivered work in JLT and Silicon Oasis, and we confirm the route at the site visit.
Cat A is the landlord’s base fit-out: ceilings, raised floor, basic lighting, air conditioning distribution and fire services to an open floor. Cat B is the tenant’s fit-out on top: partitions, finishes, joinery, meeting rooms, IT and furniture. If you are taking a shell-and-core floor, the design has to cover both. If the landlord has delivered Cat A, you need Cat B design, and the first thing we check is what the Cat A actually included, because it varies by building.
Yes, and it is the best money spent on a commercial interior. A test fit takes your headcount, meeting ratios and growth plan and lays them on the real floor plate, so you know whether the floor works before you are committed to it. It also gives you a basis to negotiate landlord contributions. See space planning and test fits.
We do, as part of the design engagement if you want it. The landlord and authority drawings are prepared from the same model and approvals are handled through to permit. Where you have your own contractor, we hand over the approved set and support their queries. See authority approvals.
Yes. The Aussie Smile dental clinic in Jumeirah and the clinic at Al Warba Centre were both designed and built in-house. Clinic design is shaped by the room schedule, sterilisation flow and finishes the health authority looks at, which we plan into the concept. The clinic fit-out page covers the full route.
Often, with phasing. The design can be planned in zones so one half of the floor is built while the other is occupied, with dust screens, out-of-hours noisy work and a temporary IT arrangement. It takes longer than a vacant floor and we say so at quotation. The office renovation page covers occupied works in more detail.
Reception desks, brand walls, storage walls, tea points and meeting-room credenzas are made in our own Al Quoz workshop to the designer’s drawings. Loose furniture is specified in the FF&E schedule and procured from manufacturers, or we design custom office furniture where a catalogue piece will not do.