Restaurant & F&B fit out
Restaurant, café, bar and F&B outlet fit out across Dubai: dining room and bar joinery from our own Al Quoz workshop, commercial kitchen builder’s work, extract, grease and gas, with the food safety, landlord and authority approvals handled under one contract.
Every restaurant in Dubai is approved from the kitchen backwards. The municipality’s food safety team looks at the layout, finishes, extract, grease management and hand-wash provision before the trade licence can be activated; the fire systems over the cooking line are checked; and the landlord has to accept where the duct discharges. A beautiful front of house built before those are settled is a beautiful room nobody can eat in.
We design and build F&B outlets with the kitchen as the first drawing, not the last. The extract route, grease trap, floor drains and gas are set out against the equipment supplier’s schedule before a partition is framed, approvals are handled as part of our scope, and the bar, counters and feature joinery are made in our own workshop while the paperwork moves. Accogliente in JVC (dining room, perforated feature wall, bar and service areas) was delivered that way, complete.
What an F&B fit out covers
Full-service restaurants, cafés and coffee shops, bars and lounges, cloud kitchens and food-hall units. The kitchen scope changes; the process does not.

Seating to capacity and circulation rules, banquettes, feature walls and finishes that survive cleaning and chairs.

Bars, service counters, back-bar displays and coffee stations with sinks, drainage, power and refrigeration provision built in.

Floors with falls, washable walls and ceilings, hoods and duct routes to a compliant discharge, coordinated with the equipment supplier.

Grease traps, floor drains and wash-up to food safety requirements; gas by approved installers, certified before connection.

Shading, lighting, furniture and the landlord and municipality consents a terrace needs before chairs go out.

Re-fits of trading outlets, phased overnight or over a short closure, with the kitchen kept compliant throughout.
How we work
Six stages under one contract. The kitchen is drawn first because nearly every check the outlet faces before opening is about the kitchen.
How we handle approvalsThe building has to accept the fit out drawings, the shopfront and, critically for F&B, the extract route. Many towers and malls have a designated kitchen-extract riser or a required discharge point, and some will not accept an outlet whose hood cannot reach it. We confirm the route, the grease drainage and the electrical capacity at the site visit, before the lease is relied on.
The kitchen is laid out from the menu and the equipment schedule: workflow from receiving to service, separation of raw and cooked preparation, washable finishes, hand-wash basins, grease management, extract and pest-proofing. The dining room, bar and counters are then designed around it, with seating to capacity and circulation rules.
We price line by line in a BOQ, so you can see what the kitchen services, the joinery and the finishes each cost. The dated programme is written around the kitchen equipment lead time and your opening date.
The landlord or mall permit, the food safety design approval of the kitchen and the permit from the authority that covers the unit are handled as part of our scope. Free-zone outlets go to the zone’s own authority, and we have worked in or can work in the DDA, DMCC, DIFC, JAFZA and DSO areas. We confirm the route at the site visit and prepare the drawings. See authority approvals.
Bars, back-bar displays, counters and banquettes are made in our Al Quoz workshop while the site is prepared. Extract, suppression, electrical supply and MEP are delivered under our contract by the group’s MEP specialists, with the related submissions coordinated as part of the project, and gas is installed and certified by an approved installer before connection.
The finished kitchen and the fire systems are inspected, the landlord signs off and releases the deposit, and the trade licence is activated. We hand over as-built drawings, test certificates and the maintenance schedule for the extract and grease system, which the inspector will ask about on the next visit.
Recent F&B and commercial work
JVC, Al Quoz, JLT, Jumeirah, Mirdif and Sharjah.







Scope & programme
We price line by line in a BOQ after surveying the unit and reading the equipment schedule, and issue a dated programme written around your opening date. These are the decisions that move both.
Extract, grease, drainage, gas, suppression and the electrical load are the largest lines in almost every F&B fit out, and the ones that cannot be value-engineered once the kitchen layout has been approved. The equipment itself is usually supplied separately; we coordinate against its schedule.
A short run to a landlord-provided riser is one cost; a long duct to a discharge point at roof level with fire dampers and attenuation is another. This is confirmed at survey because it can decide whether the unit works for a kitchen at all.
Bars with back-bar display, refrigeration and sinks are the most complex joinery in the building. Feature walls, like the perforated metal screen at Accogliente, are fabrication problems solved in the workshop and dry-assembled before site.
Flooring that takes chairs and spills, wall finishes that clean, upholstery specified for commercial wear. Cheap finishes in a restaurant are replaced within the first lease term.
A unit with a kitchen riser, grease line and adequate power is a different scope from one without. The lease’s landlord-works schedule is checked against the survey before we price.
The food safety design approval, the extract route, gas certification and the equipment delivery date. We run the approvals alongside the design and build the bar and joinery in our workshop during the wait.
What you will cook decides the kitchen, and the kitchen decides the fit out. Tell us the concept, the unit and the opening date; we will survey, confirm the extract route and the approval route, and come back with a programme and a BOQ priced line by line.
Common questions
Kitchens, extract, gas, approvals and trading through a re-fit. If yours is not here, call +971 50 353 8845.
The landlord or mall fit out permit, the food safety design approval of the kitchen, the permit from the authority that covers your unit, and gas certification by an approved installer, with the fire and electrical submissions coordinated as part of the project. The finished kitchen and fire systems are inspected before the trade licence is activated. Approvals are handled as part of our contract; we confirm the route at the site visit.
A workflow that moves from receiving and storage through preparation to service without crossing back, separation of raw and cooked preparation, washable and sealed floor, wall and ceiling finishes, hand-wash basins where staff need them, grease management on the drainage, extract over cooking equipment, pest-proofing and adequate storage. The design is approved before construction and the built kitchen is inspected before opening.
No. The deciding factor is usually the extract route: the hood needs a duct to a compliant discharge point, and many buildings only provide that through a designated riser, or not at all. Grease drainage and electrical capacity follow. We survey the unit before the lease is relied on and tell you whether a full kitchen, a limited kitchen or a reheat-only operation is realistic there.
Under our contract we build everything the kitchen sits in and connects to: floors with falls and drains, washable walls and ceilings, extract and make-up air, grease traps, gas and the electrical supply, coordinated against the equipment supplier’s schedule so every appliance lands on its services. The cooking equipment is usually supplied and commissioned by a specialist supplier, and we work to their drawings.
Yes. Bars, back-bar displays, service counters, coffee stations, banquettes, host stands and feature walls are made in our own Al Quoz workshop, with sinks, drainage, refrigeration provision and power designed in. Loose tables and chairs we either make or procure to the specification. See bespoke furniture.
Yes. Front-of-house re-fits can be phased overnight or over a short closure, with joinery pre-built in the workshop and swapped in sequence. Kitchen changes are harder, because the food safety approval and inspection apply to the altered layout, and we plan those around the quietest trading period.
Yes. Shading, lighting, furniture and planting for terraces, with the landlord’s consent and the municipality permit outdoor seating on a public frontage needs. Our landscaping team handles the external works where a terrace is being built rather than furnished.
It is set by the food safety design approval, the extract route and the kitchen equipment lead time, more than by the floor area. We issue a dated programme written around your opening date before mobilising, and build the bar and joinery in our workshop while the approvals run.
Yes. The same process applies across the UAE with the local food safety and municipal approvals substituted, and we confirm the route at the site visit. See the Abu Dhabi page.