Apartment interior design
Design and turnkey fit out for apartments in Downtown, Dubai Marina, JLT, Business Bay and The Greens: layouts, 3D, storage and joinery made in our own Al Quoz workshop, with the building’s rules planned in from the start.
Apartment design in Dubai is mostly about fitting more life into a fixed footprint: storage that does not eat the room, a kitchen that works with an open living area, bedrooms that stay cool and dark when the sun hits the glass. On top of that, every managed building runs its own rules on working hours, the service lift, corridor protection and noise. A design that ignores those either cannot be built as drawn or takes far longer than it should.
We design and build under one contract. We survey the unit as built, draw layouts and 3D views around how you actually live, and our own workshop makes the wardrobes, media walls and kitchen to the shop drawings, in pieces sized for the service lift. The building’s paperwork and logistics are planned into the job rather than left to you.
What we do in apartments
From a developer handover that needs finishing to a full strip-out and rebuild.

Strip-out and rebuild across the unit: layout, MEP, ceilings, flooring, joinery and finishes under one contract.

Taking a developer handover from empty to finished, including the flooring, joinery and lighting the shell does not include.

New cabinetry from our own workshop, worktops templated on site, and the services coordination a tower kitchen needs.

Waterproofing done properly: the one trade where a shortcut in a tower becomes your downstairs neighbour’s problem.

Wardrobes, media walls and the built-in storage that makes a compact Dubai apartment work.

A specification chosen to let or sell well rather than to photograph once: durable finishes and a neutral palette.
How it works
Four stages, each with a decision you sign off. The building’s rules are part of the plan from the first visit.
Ask about your buildingWe measure the unit as built and record the riser positions, ceiling void and AC routes, because those decide what can move. We also ask the building management for its fit-out rules, so working hours and lift access are known before anything is drawn.
Layout options first, then 3D views of each main room. This is where you decide how much storage you need, whether the kitchen opens to the living room, and which walls carry joinery. Changing a line here costs a revision, not a variation.
You choose finishes from physical samples and the BOQ is priced line by line. In parallel we prepare the drawings and method statement the developer and the building ask for, and book the service lift for deliveries.
Site work runs in the building’s permitted hours while the joinery is made in our Al Quoz workshop in lift-sized pieces. Corridors and lift cars are protected, and the unit is snagged and cleaned before the keys come back to you.
Recent apartments
La Mer, Business Bay, JLT, The Greens and Lamar in Abu Dhabi.







Scope & programme
We price line by line in a BOQ after a site visit, and issue a dated programme before work starts. These are the decisions that move both.
Paint, lighting, flooring and soft finishes with no layout change. The quickest route, and the least disruptive to the building.
New kitchen and bathrooms, joinery and upgraded lighting. Wet areas and the services behind them are what lift this above a refresh.
Reconfigured layout, imported stone and bespoke joinery throughout. A layout change usually brings a fuller approval with it.
Kitchen, bathrooms and joinery usually take the largest share. In a tower, access and lift restrictions add labour rather than material cost.
The building’s approval comes first, then the permitted working hours and service lift slots shape the rest. Moving wet areas adds to all three.
For a unit you intend to let, we specify for durability and turnaround rather than for a photograph. It usually costs less and holds up better between tenants.
Send the tower, the unit size and what you want to change. We will check the building’s fit-out rules, visit, and come back with a BOQ and a programme that fits its working hours.
Common questions
Building rules, cost, timing and renting out. If yours is not here, call +971 50 353 8845.
In most, yes. Managed towers set their own fit-out rules and ask for contractor documents before work starts. Licence and trade references are provided on request. Tell us the building and we will check its requirements before you commit.
In practice, yes. Building management will want a no-objection certificate for almost any interior work, and the developer may too. Structural, MEP or wet-area changes also need a permit from the authority that covers your area. We confirm the route at the site visit and prepare the drawings; see authority approvals.
Scope drives it more than area does. A refresh (paint, lighting, flooring and soft finishes with no layout change) is the lightest; a reconfigured layout with imported stone and bespoke joinery is the heaviest. Kitchen, bathrooms and joinery usually take the largest share. We price line by line in a BOQ after a site visit.
A refresh is quickest, a standard fit out with new kitchen and bathrooms takes longer, and a reconfigured layout longer still. The building approval sits at the front of all of them, and tower working-hour limits affect the programme, which is why we plan noisy trades around them from the start.
Only with the owner’s written consent, obtained before anything is submitted to the building. Management will ask for it. Tenants who start work without it may be asked to reinstate the unit at their own cost.
Kitchen and bathrooms first: they matter most to tenants and buyers. After that, flooring, lighting and built-in storage. For a rental we specify durable, neutral finishes that are easy to maintain between tenants, which usually costs less than a showpiece scheme and holds its condition longer.
We use it as a starting point, then survey the unit as built and design around what is actually there, including the riser positions and slab depths that decide whether a layout change is possible.
Yes. We work across the UAE, including Abu Dhabi and Sharjah. Recent apartment work includes the Apartment at Lamar in Abu Dhabi.