Office renovation

Office renovation in Dubai, phased around your team.

Refurbishment of occupied and vacant offices across Business Bay, DIFC, JLT, Media City, Al Quoz and Silicon Oasis: partitions, ceilings, flooring, MEP and joinery from our own workshop, under one contract.

The hard part of an office renovation is the business carrying on inside it.

A new office fit-out starts from an empty floor. A renovation starts from desks, servers, a reception that cannot close and a lease that is still running. The work has to be zoned, phased and partly done out of hours; moving a single partition can mean redrawing the fire layout; and the landlord wants to know how the lift, the lobby and the neighbours will be protected. Most quotations describe the finished office and say nothing about how the business gets there.

We write the method statement before the price. We survey the existing Category A installation to decide what can stay, agree a phasing plan with you and the landlord, programme noisy work into the windows the building allows, and make joinery and reception elements in our Al Quoz workshop so they arrive ready to fix rather than being built on your floor.

40+In-house craftsmen in joinery, tiling and gypsum
25+Projects delivered across residential, commercial, retail and healthcare
ISO45001:2018 certified for occupational health & safety on live sites
20yrsOur group’s background in construction

What an office renovation covers

A refresh, a reconfiguration, or back to Cat A.

Most office renovations fall into one of three scopes, and the phasing and paperwork differ for each.

How it runs

How an office renovation runs with us.

Four stages, planned so the business keeps working. The phasing plan is agreed before the price is final, because it changes the price.

Book a site visit
01

Survey, fit-out guide and lease

We survey the ceiling grid, AC, sprinklers, raised floor and lighting to see what is sound. We read the building’s fit-out guide (hours for noisy work, lift bookings, protection, deposit) and look at your lease’s reinstatement clause, because what you build now you may have to remove at expiry.

02

Phasing plan, design and BOQ

We split the floor into zones and agree with you where people sit while each zone is worked on. The design follows: layouts, meeting rooms, finishes, and a BOQ priced line by line with a phased programme showing which zone is affected when. Occupied and vacant options can be priced side by side.

03

Approvals and workshop production

The landlord and authority paperwork is handled while reception desks, meeting-room credenzas, pantry units and storage walls are made in our Al Quoz workshop. Making them off site keeps sawdust and noise off your floor.

04

Phased works and handover

One zone at a time, sealed with dust screens, with flooring and reception changeovers done at weekends where needed. MEP alterations such as AC rebalancing and sprinkler changes are coordinated under our contract. At the end the landlord inspects and releases the deposit.

Recent commercial work

Offices and workplaces across Dubai

Al Quoz, Silicon Oasis, JLT and Sharjah.

Polygon Agglayer Office: office renovation and fit out in Al Quoz, Dubai
Polygon: Agglayer OfficeOffice fit out · Al Quoz, Dubai
Proglobal Media Agency: office fit out in Silicon Oasis, Dubai
Proglobal Media AgencyOffice fit out · Silicon Oasis, Dubai
Health and Wellness Centre: wellness fit out in JLT, Dubai
Health & Wellness CentreWellness fit out · JLT, Dubai
Aussie Smile Dental Clinic: healthcare fit out in Jumeirah, Dubai
Aussie Smile Dental ClinicHealthcare fit out · Jumeirah, Dubai
Platform Health Club: fitness fit out in Sharjah
Platform Health ClubFitness fit out · Sharjah
Five Mode Retail Store: retail fit out in JVC, Dubai
Five Mode Retail StoreRetail fit out · JVC, Dubai
Accogliente Restaurant: restaurant fit out in JVC, Dubai
Accogliente RestaurantRestaurant fit out · JVC, Dubai

Scope & programme

What drives an office renovation budget.

We price from a BOQ after surveying the existing installation, and issue a phased programme that shows which zone is affected when. These are the decisions that move both.

What the existing Cat A can keep

Ceilings, AC, sprinklers and raised floors that are in good order are reused; that is the biggest saving available in a renovation. We survey them before pricing rather than assuming replacement.

Layout change or finishes only

New carpet, paint, lighting and joinery within the existing partitions is a refresh. Moving partitions brings a revised fire layout, AC rebalancing and sprinkler changes with it.

Occupied or vacant

Working around staff means phasing, dust screens, temporary desks and weekend or night shifts. It costs more and takes longer than a vacant floor, and we show the difference in the quotation.

Where the money goes

In an office it is partitions, ceilings and MEP alterations first, then flooring and joinery. Reception and meeting-room joinery is where the design budget shows; back-of-house is where it can be saved.

The building and its rules

A building that allows noisy work only out of hours, or shares one service lift, stretches the programme. So does the approval route for the building’s location, which we confirm at the site visit.

Lease and dilapidations

If the lease ends within a few years, the landlord’s reinstatement clause matters: what you build now you may have to remove. We design the renovation with that clause in view.

Start with a site visit.

Tell us the building, the headcount and what is not working. We will survey the existing installation, agree what can stay, and come back with a phased programme and a BOQ you can compare.

Common questions

Office renovation in Dubai, answered.

Approvals, phasing, reuse and what happens at the end of the lease. If yours is not here, call +971 50 353 8845.

Do I need approval to renovate my office in Dubai?

Yes. The landlord or building management approves the drawings and the contractor and issues a fit-out NOC, and the authority that covers the building (on the mainland or in a free zone) approves the works. Moving partitions also means the fire layout has to be updated and approved. A refresh of finishes with no layout change usually needs less. We confirm the route at the site visit, prepare the drawings and handle the submissions. More on our authority approvals page, and on area pages such as JVC and Downtown Dubai.

Can you renovate while we keep working in the office?

Yes. We split the floor into zones, move one zone at a time to temporary positions, seal the active zone with dust screens and run noisy work in the hours the building permits, with weekend changeovers for flooring and reception. It is slower and costs more than a vacant floor, and we show both options in the quotation so you can decide.

What is the difference between office renovation and office fit-out?

A fit-out starts from an empty Category A shell and builds a complete office. A renovation starts from an existing, usually occupied, fit-out and changes or refreshes it, reusing whatever is still in good order. A renovation also raises the question of the landlord’s reinstatement clause. Our office fit-out page covers the empty-shell route.

What do you need from us before the site visit?

The building’s fit-out guide if you have it, any drawings of the existing fit-out, your headcount now and in the near future, and a rough idea of when the lease ends. It also helps to know which areas cannot be disturbed during working hours, such as a server room, reception or client meeting rooms.

How do you decide the phasing?

From how your team actually works. We look at which departments can share space for a while, which rooms are needed every day and where temporary desks can go. Usually the noisiest and dirtiest zones go first and reception goes last, over a weekend, so visitors see as little of the works as possible.

Can you reuse our existing ceilings, AC and flooring?

Usually some of it, and it is the largest saving available. We survey the Cat A installation (ceiling grid, AC units and ducting, sprinklers, raised floor, lighting) and keep what is sound, with AC rebalancing and sprinkler changes coordinated under our contract. Where the existing installation is at the end of its life we say so, because replacing it mid-renovation costs more than planning it.

Do you make the reception desk and joinery yourselves?

Yes. Reception desks, feature walls, meeting-room credenzas, pantry units and storage walls are made in our own Al Quoz workshop by our in-house craftsmen and installed on site, which makes a weekend changeover possible. See the Polygon office in Al Quoz for an example.

What about the landlord’s reinstatement clause?

Most Dubai office leases require the tenant to return the unit to its original condition at expiry. We design the renovation with that clause in view (demountable partitions, floor finishes that lift, services kept within the landlord’s zones) so what you build now does not become an expensive removal later.

Do you renovate offices outside Dubai?

Yes. We work across the UAE, including Abu Dhabi and Sharjah. Recent commercial work includes the Platform Health Club in Sharjah.