Jumeirah
Aussie Smile Dental Clinic delivered in Jumeirah: a healthcare interior designed around clinical requirements and the services each chair needs. We also take on villa interiors and renovation across Jumeirah and Umm Suqeim.
Aussie Smile wanted a dental clinic that felt composed and approachable rather than conventionally clinical. The design answers that with softly curved forms, integrated lighting and a restrained palette carried through reception, waiting, consultation and treatment, so a patient experiences one continuous space rather than a corridor of rooms.
Underneath that, a healthcare interior has to satisfy requirements an ordinary fit out does not: treatment room sizes, hand wash provision, surfaces that clean easily, separation of clean and sterilisation zones, and the drainage, suction and power each chair needs. At Aussie Smile those requirements shaped the layout as much as the look did, so the curves and lighting were designed around them rather than on top of them.
Our Jumeirah work
A dental clinic in Jumeirah, alongside healthcare, retail and residential work across Dubai.







Approvals
A healthcare fit out adds a design review to the usual permit route, and it comes before construction rather than after it. We confirm the full route for your unit at the site visit.
Ask about your unitFor a clinic, the architectural layout is reviewed against the health facility guidelines before any physical work begins: treatment and consultation room sizes, hand wash basin provision, infection-control surfaces, ventilation, and the separation of clean areas from sterilisation and clinical waste. Getting this sign-off first protects the route to an operating licence.
Jumeirah is an established mainland area. Fit out and any structural, facade or MEP alteration needs a permit from the authority that covers the area, plus the landlord’s consent for a leased unit. We confirm the route at the site visit and prepare the drawings. More on our approvals page.
Changes to partitions, ceilings, sprinklers, fire detection, emergency lighting and escape routes need Civil Defence approval, with an inspection before handover. In a clinic this is rarely avoidable, because the treatment room layout is itself a partition change.
Load increases and new distribution boards need DEWA sign-off, coordinated as part of the project. Chair drainage, suction and power are coordinated with the equipment supplier before partitions are framed, not after.
What we do here
Jumeirah mixes low-rise commercial streets with large, established villas on generous plots, and both come to us.

Reception, waiting, consultation, treatment and sterilisation, with surfaces, zoning and chair services built to health authority requirements.

Concept, 3D visualisation, materials and joinery shop drawings for Jumeirah’s established villas, drawn from a measured survey of the house as it stands.

Strip-out through to finishes for older villas, with the permit handled as part of the project and existing services checked before the design is fixed.

Shopfront, display joinery and lighting, with landlord and authority approvals handled.

Reception desks, treatment room casework and storage made in our Al Quoz workshop and delivered finished.

Design, approvals, joinery, MEP coordination and site delivery under a single contract and one project manager.
Scope & programme
We price line by line in a BOQ after a site visit and issue a programme before work starts. These are the decisions that move both.
Room sizes, hand wash provision, infection-control surfaces and clean-to-sterilisation separation are set by guideline, not preference. They shape the plan before the design does.
Dental chairs need dedicated drainage, suction and power to each position. Coordinating these with the supplier before framing avoids opening partitions again later.
Many Jumeirah villas have been extended or altered over the years. Existing wiring, plumbing and waterproofing are checked at survey, because what is behind the walls decides how far a renovation has to go.
In healthcare, services and casework. In a villa, kitchens, bathrooms and joinery.
For a clinic, the design review before construction, then the permit and fire-safety approval. Where the scope allows, joinery production starts in the workshop while approvals are in progress.
Imaging rooms and their shielding, relocating wet areas, structural change, and long-lead imported materials. All flagged at quotation stage.
Give us the unit or villa and what you want to do. We will visit, confirm which design review and permits apply, coordinate with your equipment supplier where needed, and come back with a BOQ you can compare properly.
Common questions
Clinic requirements, approvals and villa work. If yours is not here, call +971 50 353 8845.
The architectural layout is reviewed against the health facility guidelines before construction begins, covering treatment and consultation room sizes, hand wash basin provision, infection-control surfaces, ventilation and the separation of clean areas from sterilisation and clinical waste. On top of that sit the fit out permit from the authority that covers the area and Civil Defence approval with a pre-handover inspection. Getting the design sign-off first protects the route to an operating licence.
The permit comes from the authority that covers the area, and for a leased unit you also need the landlord’s consent. Not every job needs a permit: finishes and loose furniture usually do not, while structural, facade and MEP changes do. We confirm the route for your property at the site visit and prepare the drawings. See our approvals page for how we handle this across Dubai.
Scope and clinical requirement drive it rather than floor area. Services and casework are the largest lines in healthcare: chair drainage, suction and power to each position, infection-control surfaces, and the sterilisation area. Imaging rooms add shielding. We survey the unit, coordinate with your equipment supplier, and price line by line in a BOQ.
Yes, and it is the part most often left too late. Chair drainage, suction and power routes have to be set out against the ceiling and partition layout before framing, because a service discovered after the partitions are closed means opening them again. We bring the supplier’s requirements into the drawings at design stage.
Yes. Jumeirah’s villas are established properties, often altered over the years, so we measure as built rather than relying on original drawings and check existing services before fixing the design. See our villa interior design and villa renovation pages.
Yes: shopfront, display joinery, partitions and lighting, with landlord and authority approvals handled. Display joinery is built to be reconfigured as collections change. See our Five Mode store and the Neo-Arabic abaya boutique.
Yes, in our own Al Quoz workshop. Reception desks, treatment room casework and storage are made off site and delivered finished, which matters in a clinic because the surfaces have to be easy to clean, and a workshop finish is more consistent than one built on site.