Villa interior fit-out

Villa fit-out in Dubai, from handover to finished home.

New-build and shell-and-core villas across Dubai Hills, Al Furjan, The Valley, Arabian Ranches, Tilal Al Ghaf and Palm Jumeirah: design, MEP, kitchens, bathrooms and joinery from our own Al Quoz workshop, under one contract.

A new villa is handed over to the developer’s spec, not yours.

Handover day in Dubai Hills, Al Furjan or The Valley means a villa with standard porcelain, a basic kitchen or an empty kitchen wall, builder-grade bathrooms, white walls and a lighting layout that assumes nothing about how you live. Shell-and-core villas come with less: structure, envelope and service connections, and nothing inside. Either way, the home you bought still has to be made.

That is a fit-out, not a renovation, and the difference matters. There is nothing to strip out, the slab and services are new, and the work runs from survey to joinery rather than from demolition. We fit out new villas as one scope: our design team draws every room, MEP is coordinated under our contract, and our own workshop makes the kitchen, wardrobes, vanities and panelling while the site is prepared. You deal with one project manager from the first survey to handover.

If your villa has already been lived in, the villa renovation page is the right one; if you only want the drawings, see villa interior design.

6Developer registrations: Emaar, Nakheel, Meraas, Dubai Holding, Nshama and DAMAC
40+In-house craftsmen in joinery, tiling and gypsum
1Contract covering design, joinery production and site work
ISO45001:2018 certified for occupational health & safety

What a villa fit-out covers

Handover-condition or shell and core.

The scope depends on what the developer gives you. Both run under one contract and one project manager.

Process

How a new villa fit-out runs.

The order matters: survey before drawings, drawings signed off before site, joinery in production while the site is prepared.

Ask about your villa
01

Snagging and as-built survey

We review your developer snag list, or attend the inspection, so defects are logged with the developer rather than absorbed into the fit-out. Then we measure the villa as built. Handover drawings are often out by enough to matter for a kitchen run, a wardrobe wall or a stair cladding module, and services are rarely exactly where the plan shows them.

02

Design, 3D and shop drawings

Layouts for every room, 3D visualisation so you see the finished villa before committing, a material schedule and joinery shop drawings. One drawing set serves the developer submission, the workshop and the site, so nothing is drawn that cannot be built.

03

Samples, BOQ and sign-off

You choose stone, veneer, tile, paint and ironmongery from physical samples, and the BOQ is priced line by line against those choices. Imported items with long lead times are ordered first. Once you sign off, the drawings are frozen and production starts.

04

MEP first fix while joinery is made

New circuits, relocated sockets and switches, AC rebalancing for a changed layout, plumbing for the kitchen and bathrooms, and containment for any smart-home system go in, coordinated under our contract, while our Al Quoz workshop makes the kitchen, wardrobes, vanities and panelling to the shop drawings.

05

Finishes, installation and move-in

Flooring, ceilings, stone and paint, then joinery templated against the finished room and installed by our own fitters, then loose furniture, curtains and lighting. The villa is snagged against the drawings, cleaned and handed over once, with one point of contact afterwards.

Recent villas

Villa fit-outs across Dubai

The Greens, Al Furjan, Tilal Al Furjan, Dubai Hills and The Valley.

Villa at The Greens, villa fit-out in The Greens, Dubai
Villa at The GreensVilla interior · The Greens, Dubai
Villa Al Quortaj, villa fit-out in Al Furjan, Dubai
Villa Al QuortajVilla interior · Al Furjan, Dubai
Villa at Tilal Al Furjan, villa fit-out in Tilal Al Furjan, Dubai
Villa at Tilal Al FurjanVilla interior · Tilal Al Furjan, Dubai
Golf Place, villa and landscape fit-out in Dubai Hills Estate, Dubai
Golf PlaceVilla & landscape · Dubai Hills Estate, Dubai
Townhouse at Emaar Valley, townhouse fit-out in The Valley, Dubai
Townhouse at Emaar ValleyTownhouse interior · The Valley, Dubai
Senses, The Fields, residence fit-out in Meydan, Dubai
Senses, The FieldsPrivate residence · Meydan, Dubai
The Dahlia, whole-home fit-out in Abu Dhabi
The DahliaPrivate residence · Abu Dhabi

Scope & programme

What drives a villa fit-out budget.

We price line by line in a BOQ after the survey rather than quoting a flat rate, and issue a dated programme before work starts. These are the decisions that move both.

What the developer gives you

A handover-finished villa keeps its floors, ceilings and bathrooms unless you decide otherwise. Shell and core needs all of them plus screeds, partitions and full MEP, and is a different programme from day one.

Keep or replace the developer kitchen

Some developer kitchens are worth keeping with new fronts and worktops; most owners replace them. Building from the empty wall in a shell-and-core villa is the larger scope, and the one our workshop is set up for.

Moving wet areas

Keeping bathrooms and the kitchen where the developer put them is the simpler route. Moving them means new drainage, new waterproofing and a fuller approval, and we flag it at design stage so you can decide with the facts in front of you.

The joinery package

Wardrobes in every bedroom, a walk-in closet, TV walls, panelling and a majlis are usually the biggest single line after the kitchen. Making them in our own workshop keeps the cost and the production schedule in our hands.

Finish level and imported materials

Natural stone, veneer and imported sanitaryware or lighting change both the budget and the programme. We show you where a premium finish is worth it (the entrance, the master suite, the majlis) and where a good standard finish will do.

Outdoors

New villas come with bare plots. Landscaping, a pool and an outdoor majlis are often added at the same time, and running them with the interior avoids a second mobilisation.

Start before the keys arrive.

Tell us the community, the handover date and what the developer is delivering. We can take the design to 3D stage from the developer drawings, then confirm everything at an as-built survey once you get the keys.

Common questions

Villa fit-out in Dubai, answered.

Handover, approvals, shell and core, and what to do first. If yours is not here, call +971 50 353 8845.

What is the difference between a villa fit-out and a villa renovation?

A fit-out starts from a new villa, either handover-finished or shell and core, with nothing to strip out and new services to work with. A renovation starts from a lived-in villa, usually with the previous finishes coming out first. The sequence and the programme are different, which is why we keep villa renovation on its own page.

Do I need approvals to fit out a brand-new villa?

Usually, yes. Most communities need the master developer’s NOC before a contractor can start, and works that touch structure, the facade or wet areas also need a permit from the authority that covers your area. We confirm the route at the site visit and prepare the drawings. See authority approvals for how it works.

What does shell and core mean for a villa?

The developer delivers the structure, the external envelope, windows and doors, and service connections to the plot, with no floor finishes, ceilings, internal partitions, kitchen or bathrooms. The fit-out builds everything inside. It is a larger scope than a handover-finished villa and we plan it as one from the start, with partitions, screeds and MEP before any finish.

Can I keep the developer’s kitchen and bathrooms?

Yes, and in some communities they are good enough to keep with new fronts, worktops or sanitaryware. We tell you honestly at survey which items are worth keeping and which will date the villa. Replacing bathroom tiles means redoing the waterproofing and falls beneath them, which we price in rather than tile over.

When should I start the design?

Before handover. We can take the design to concept and 3D from the developer’s drawings, then confirm every dimension at an as-built survey once you have the keys. That way the drawings, samples and joinery production are ready to move as soon as the villa is yours.

Have you worked in Al Furjan and Tilal Al Furjan?

Yes. Our villa projects there include Villa Al Quortaj, the villa at Tilal Al Furjan and a villa renovation in Al Furjan. The Al Furjan page covers the community in more detail.

Can you do the garden and pool at the same time?

Yes. New villas are handed over with bare plots, and landscaping, pool, pergola and outdoor majlis are often planned with the interior. Running them together means one mobilisation, one team and one programme. See landscaping and exterior works.

Do you fit out villas outside Dubai?

Yes. We work across the UAE including Abu Dhabi and Sharjah. The Dahlia in Abu Dhabi covered interior design, bespoke joinery, bathrooms, dressing rooms and lighting.