Property upgrade before move-in

Upgrade your new property in Dubai before you move in.

Developer-finish upgrades for new villas, townhouses and apartments in the window between handover and occupation or letting: flooring, kitchens, wardrobes, bathrooms, lighting and paint, with the developer NOC applied for straight after handover and the work sequenced before a single piece of furniture arrives.

The empty property after handover is the cheapest renovation you will ever do.

A new villa or apartment is handed over with the developer’s standard finish: the tile everyone in the community has, a kitchen chosen to a budget, white walls, a lighting layout that was never designed around furniture. Many owners live with it for a while, then renovate around sofas, beds and a family. Everything is slower, dustier and more expensive than it would have been in the empty unit, and the floor that was going to be replaced anyway has been protected, cleaned and walked on in the meantime.

We work the gap instead. We join your handover walk-through, split what the developer owes you under snagging from what you want upgraded, apply for the developer’s NOC as soon as the handover documents are issued, and run the upgrades in trade order through an empty property, with kitchens, wardrobes and panelling made in our own Al Quoz workshop while the NOC runs. You move in once, into the finish you actually wanted. Investors do the same and get the unit to market without a second round of works.

25+Projects delivered across residential, commercial, retail and healthcare
40+In-house craftsmen in joinery, tiling and gypsum
1Move: into the finished property, not around a renovation later
ISO45001:2018 certified for occupational health & safety

What owners upgrade before moving in

The developer finishes most worth replacing while the unit is empty.

In rough order of how much harder each becomes once the furniture is in.

Sequence

How the handover window is used.

The order matters more than the speed. Done in the wrong order, the same scope costs more and takes longer.

Book a handover visit
01

Snagging first, scope second

At handover the developer owes you a unit free of defects and fixes them under the terms of your sale agreement. Those are not upgrades and you should not pay for them. We walk the unit with you, log the cracked tile and the misaligned door for the developer, and list separately what you want changed, so the two never get confused and the developer’s obligation is not lost by our starting work on top of it.

02

Design and BOQ while the paperwork starts

We measure, agree the upgrades with you and price them line by line. The developer NOC can only be applied for once the handover documents exist, so the drawings are ready to go in as soon as they do. Joinery is drawn and put into production in our workshop in the meantime.

03

Trade order through an empty unit

Electrical and AC changes first, while ceilings are open. Then flooring, with the whole property clear. Then kitchens, wardrobes and joinery, which were made in our Al Quoz workshop during the NOC wait. Then paint, then bathrooms and sanitaryware. Nothing is done twice and nothing is moved to make room, which is the entire saving of doing it now.

04

Clean, utilities, and in

A builder’s clean, power and water connected in your name if not already done, a final walk-through against the scope, and the unit is ready for furniture delivery or, for an investor, for the photographer and the listing. Manuals and product paperwork for appliances and fittings are handed over in one file.

Recent new-build interiors

Properties finished before their owners moved in

Tilal Al Furjan, The Valley, Al Furjan, Meydan, The Greens and Abu Dhabi.

Villa at Tilal Al Furjan: villa interior in Tilal Al Furjan, Dubai
Villa at Tilal Al FurjanVilla interior · Tilal Al Furjan, Dubai
Townhouse at Emaar Valley: townhouse interior in The Valley, Dubai
Townhouse at Emaar ValleyTownhouse interior · The Valley, Dubai
Villa Al Quortaj: villa interior in Al Furjan, Dubai
Villa Al QuortajVilla interior · Al Furjan, Dubai
Senses, The Fields: private residence in Meydan, Dubai
Senses, The FieldsPrivate residence · Meydan, Dubai
Villa at The Greens: villa interior in The Greens, Dubai
Villa at The GreensVilla interior · The Greens, Dubai
Apartment at Lamar: apartment interior in Abu Dhabi
Apartment at LamarApartment interior · Abu Dhabi
The Dahlia: private residence in Abu Dhabi
The DahliaPrivate residence · Abu Dhabi

Scope & programme

What drives a pre-move-in upgrade budget.

We price line by line in a BOQ after the handover walk-through, and issue a programme that starts when the NOC is issued. These are the decisions that move both.

Replace or keep the developer finish

Some developer kitchens and tiles are worth keeping and some are not. We tell you honestly at the walk-through, because replacing a sound finish is the one cost in this scope that is avoidable.

Flooring across the whole property

Replacing floors is the largest line and the reason to do this now rather than later. Large-format porcelain and natural stone move the number more than timber or SPC.

Kitchen and wardrobes

Joinery is usually the second-largest line. Because it is made in our own workshop during the NOC wait, it adds little to the programme; the specification is what moves the cost.

Cosmetic or layout change

Paint, floors, joinery and lighting usually need only the developer NOC. Moving a wall or a bathroom brings a fuller approval route and a longer front end, which is why most pre-move-in upgrades stay cosmetic.

Owner-occupier or investor

An investor specification is durable and neutral and skips the personal items. An owner-occupier specification is where feature lighting, panelling and stone go. The two are priced very differently and we ask which you are first.

What sets the programme

The developer NOC sits at the front. After that, long-lead items such as imported stone and specified appliances set the critical path, so we check lead times before the programme is issued.

Book us for handover day.

Tell us the community and the handover date. We will walk the unit with you, separate snags from upgrades, and come back with a BOQ and a programme that starts as soon as the documents are issued.

Common questions

Upgrading before move-in, answered.

Snagging, NOC timing, what to upgrade and what to leave. If yours is not here, call +971 50 353 8845.

Can I start renovating as soon as I get the keys?

Not quite. In a master-planned community the developer’s NOC must be issued before any work starts, and it can only be applied for once the handover documents exist. Cosmetic upgrades usually need only that; moving a wall or a bathroom also needs the permit from the authority that covers your area. We confirm the route at the walk-through, prepare the drawings and handle the submissions. More on our authority approvals page.

What is the difference between snagging and upgrading?

Snagging is the list of defects the developer must fix at its own cost under your sale agreement: cracked tiles, doors that do not close, leaks, paint faults. Upgrading is anything you choose to change from the delivered specification. We keep the two lists separate so you do not pay for the developer’s obligations and so starting our work does not muddy them.

Does upgrading affect what the developer still has to fix?

Only for what you change. If you replace the kitchen, the developer is no longer responsible for the kitchen; the structure, services and everything untouched stay with the developer under your sale agreement. We record the condition of what we remove and photograph what we keep, so the boundary is clear if a question comes up later.

What is worth upgrading before I move in, and what can wait?

Flooring, wardrobes, electrical and lighting changes, and the kitchen are far cheaper and faster in an empty property and should be done now if you intend to do them at all. Paint is easy either way. Bathrooms depend on whether tiling changes. Furniture, curtains and loose items can wait. We give you that split honestly at the walk-through.

I am an investor. Can you prepare a new unit for letting?

Yes. We specify for durability and broad appeal (porcelain in living areas, hard-wearing joinery finishes, simple lighting), sequence the programme so the unit can be photographed as soon as the clean is done, and hand over a single file of manuals for the tenant. See also our apartment renovation page for the renovate-to-let angle on existing units.

Do you handle the utilities?

The DEWA connection is in the owner’s name and we guide you through it so power and water are live for our works and for your move-in. Where the upgrade changes the electrical load, such as additional circuits or a larger distribution board, the submission is coordinated as part of the project.

Which communities do you do this in?

We are registered with six of Dubai’s major developers: Emaar, Nakheel, Meraas, Dubai Holding, Nshama and DAMAC, and we also work in Abu Dhabi. Recent new-build work includes Tilal Al Furjan, The Valley, Meydan and The Greens. Our area pages cover each community.

Can you also furnish the property?

We make the fixed and bespoke items (kitchens, wardrobes, panelling, TV units, headboards, dining tables) in our own workshop, with curtains and upholstery made in house too, and can coordinate loose furniture delivery into the finished unit. See our joinery and custom furniture pages.

Do you work outside Dubai?

Yes. We work across the UAE, including Abu Dhabi and Sharjah, and confirm each developer’s requirements at the walk-through. Recent new-build work in Abu Dhabi includes The Dahlia and the apartment at Lamar.